• banner-image

The Money Pit LJ Gets Completed!

Money Pit LJ

Welcome back! Lets finish this thing and get it out on the trails!

So the first thing to notice is that we moved the Jeep to our shop because we have some custom aluminum features that will be much easier with access to the brake and shear. So this may be where this build goes beyond the average garage build. Also having access to the lift, we decided to pull the body back off and make a few adjustments.

Money Pit LJ

So the body comes off to run the shift cables for the transfer case and transmission through the floor in the correct location. After that the body will be set back on the chassis for good.

Money Pit LJ

Time to move on to the custom aluminum dash. We designed this dash on our CAD program and had the local shop laser cut it from .100 aluminum sheet. The tubes are 1″ x.125 wall aluminum. We bent them in our tubing bender, and tried to use a Harbor Freight roller for the long radius, but that thing leaves a whole lot to be desired. Even after about 6 hours of straightening, aligning and adjusting, we still got a bend that was barley acceptable.

Money Pit LJ

All of the center console panels are removable, so wiring and maintenance will be a breeze.

Money Pit LJ

We are using a Winters reverse pattern shifter for our 4L80 and the stock Atlas twin stick shifter for the transfer case. The dash panel swings down to access all of the electronics.

Money Pit LJ

We are using a gauge cluster from Dakota Digital.This unit is very programmable and is designed to accept up to 16 additional input modules for almost anything you want to add. We added a compass and temp module, trans gear display module, fuel pressure module and trans temp module. Super clean and well designed.

Money Pit LJ

The cage is next. Here we add the mounting tabs for the windshield to the cage before we remove it for final welding and powder coat.

Money Pit LJ

Next we pull out the cage and complete the final welding, cleaning and prep for powder.

Money Pit LJ

Drilling holes for the seat sliders and adding tabs for the harnesses and console.

Money Pit LJ

These brackets tie the A pillars through the body to the rock rails.

Money Pit LJ

We purchased these sun visors from Kartek and welded them in. We also added a hoop to the front tube to move the intrusion bars and mirror mount forward.

Money Pit LJ

These 2 tabs are for the front of the center console.

Money Pit LJ

We added tabs for the roof panel and side emblems.

Money Pit LJ

We cut 4″ off the C pillar so that it would land on our aluminum side boxes. After that we welded, cleaned and prepped.

Money Pit LJ

The GenRight front bumper had to be cut because we kicked the bottom of our grill forward for a sleeker look.

Money Pit LJ

We fabricated this front shock tower tie in. It runs from the left tower to the right.

Money Pit LJ

This aluminum steering column is from PSC. We made an aluminum mount that uses the stock column mounting bolts.

Money Pit LJ

Next we covered the grill with satin white wrap.

Money Pit LJ

And installed all of the fun stuff.

Money Pit LJ

This Mishimoto cooler will be used for the power steering fluid.

Money Pit LJ

The fans are installed into the shroud.

Money Pit LJ

Then the shroud is installed onto the grill. Behind the shroud is an aluminum LS3 radiator, A/C condenser and P/S cooler.

Money Pit LJ

Before we install the grill we plumbed the power steering box.

Money Pit LJ

We also installed the GenRight mounts for the alternator, PSC pump and resevoir.

Money Pit LJ

We mounted the Wilwood master cylinders to our firewall plate and installed the fuel pressure block and sender.

Money Pit LJ

Powder coat is back!

Money Pit LJ

And then the grill finds its home. The bumper and winch go on.

Money Pit LJ

The hood was ordered from GenRight. It’s beautiful carbon fiber!

Money Pit LJ

The door jambs get painted and the doors wrapped.

Money Pit LJ

The red is going to look incredible with the red Raceline Wheels!

Money Pit LJ

Next up we built these cool tool boxes. They are only about 4″ deep but great for straps, pullies, tools and some small spare parts. The lids are water proof. The passenger side will have a sub woofer and amp mounted toward the front.

Money Pit LJ

They are flush to the top of the tub sides.

Money Pit LJ

On the driver’s side we marked out the cuts for the battery box.

Money Pit LJ

And then cut it out and cleaned it up. Then we bent up a piece of steel and welded it in.

Money Pit LJ

A coat of bed liner and it looks great!

Money Pit LJ

We wrapped the GenRight corner guards and installed them with the provided hardware. The tail lights are also installed.

Money Pit LJ

The tailgate gets wrapped in satin red and installed. It looks awesome!

Money Pit LJ

These GenRight boat side rockers are a challenge to get aligned, but they are now right where they need to be.

Money Pit LJ

The battery goes in and is fastened down with the provided hardware.

Money Pit LJ

We pre-wire the tool box with a battery cut off switch, jump terminals and a fuse.

Money Pit LJ

The dash is going back in!

The cage gets bolted into its final resting place.

Money Pit LJ

The dash and sun visors are looking so good!

Money Pit LJ

The dash and sun visors are looking so good!

Money Pit LJ

The windshield frame gets wrapped and new glass installed. We installed the glass without the rubber gasket for a cleaner finish.

Money Pit LJ

There is a bunch of wiring to do!

Money Pit LJ

The driver’s side looks incredible! We used a blinker unit from Grote. It incorporates the blinkers, stop lights, hazards, wipers, high beams and horn button. The side and rear view mirrors are made by Scosche. We are using 2 Switch Pros switch panels to control all of our accessories on board. These units are very well made and versatile.

Money Pit LJ

Ready to go for it. 3 days later it was complete.

Money Pit LJ

These seats were provided by Simpson and look and feel incredible!

Money Pit LJ

After we bled the brakes, the tires will go on.

Money Pit LJ

Time for some graphics! The red mirror matches the Raceline wheels. 50/50 is the new name of this Jeep. Representing that it’s half red and half white, but also that this build was a collaboration between us and some great companies like GenRight Off Road, Summit Machine Inc., Currie Enterprises, Maximum Transmission and Raceline Wheels.

Money Pit LJ

We also partnered with R1 Concepts, Advance Adapters, J. E. Reel Driveline Service, Simpson Racing, RockJock 4X4, AGM, Rockstar Garage and Mishimoto on this build. May of these companies offer generous discounts through Money Pit Classifieds and we would very much appreciate you using our discount codes when making your next purchase. Also don’t forget to tell them you saw their awesome products on this build!

Nothing left now but to show you the finished product. We think you will like how it turned out!

Thanks for reading all the way through to the end of this series. We know it’s a lot and we hope you enjoyed it. If you have any questions regarding this build or the companies that partnered with Money Pit Classifieds, please do not hesitate to ask. You can email Mark at moneypitmark@gmail.com.

Hopefully we will see you out on the trail and you can take a look at 50/50!

, , , , , , , , , , ,